In the below 6 images the client needed the school kitchen tiles re grouting, painting and any missing or broken tiles replaced. They also required the flooring repaired where it had come away from the wall, lifted or split.
In the below 6 images the client needed 1 large unused classrom to be converted into 1 smaller classroom, 2 offices and a hallway to utilise the space better for their needs.
- Steve